Donna Runaway Bride progress

Thanks to Chase being sick all last weekend and then me being home sick this week, I’ve nearly got the beading on Donna done!

Thanks to being sick for a few days I got a LOT of beading done on this dress.kelldar.com/portfolio/donna-noble-runaway-brideKelldar.com | My Facebook Page | Tumblr | Instagram

I threw it on this morning to see how it was looking.

In-progress for Dragoncon 2013. The beading of the top is mostly done. Trying on the dress again with that part finished. Next up, a petticoat.kelldar.com/portfolio/donna-noble-runaway-brideKelldar.com | My Facebook Page | Tumblr | Instagram

The train ended up being too long, but I’m not shortening it because I like it and it’s pretty. Also, Kermit is sticking out of my head.

In-progress for Dragoncon 2013. Another shot of the test fit.Kelldar.com | My Facebook Page | Tumblr | Instagram

So I’ve got left:
-finish beading
-finish petticoat – I say finish when really all I’ve got is a bag of netting, but I’ve been thinking about it. That counts as work being done on it, right?
-find shoes – hitting up goodwill for some cast-off bridesmaid shoes today
-make the veil

Also heading to Tandy today to get ideas for my last costume for dcon this year.