So here’s what I’ve got planned for now.
Enchantress: quick and easy.
DC Character: light on sewing. more of a crafty-thing.
April projects:
Lady Blackhawk: all sewing.
Donna: piece-mealed, will probably make the jacket.
(I’m hoping to actually start on these in March and move everything up a bit.)
May projects:
Marie Antoinette: just starting on it May, don’t plan to have it done within the month. work intensive.
Marvel character: light on sewing. chase making a good bit of it.
June:
Charlotte: fairly intensive, plus wig work.
Moonstone: quick, fairly easy.
July:
Movie Costume: work intensive.
August:
TV costume: work intensive.
Movie costume: completely piece-mealed.
I’m afraid I’m going to have to drop one of the work-intensive ones – simply based on $$. I have 4 costumes that require a lot of fabric, and that’s a lot of fabric to buy. If I do – it’ll be the July costume – I will probably move it to October to be my Halloween costume and bump Belle christmas dress to next year (again).